Eastport-South Manor Central School District Smart School
Smart Schools Project
ECC Technologies provided the technology and security consulting design services in conjunction with the District’s Architectural firm, H2M.
ECC also provided Construction Administration services for the project that was constructed over a 15-month period. The project was completed in June of 2021 and was within the available $2,279,065 Smart Schools allocation.
Scope of Work
Telecom Grounding System.
Network Switch, UPS and Cabling Upgrades.
Wireless Network Upgrades.
Campus Fiber replacements and upgrades.
Video Surveillance Software, Server and Camera placement (Genetec VMS Software and servers with Axis Cameras).
Door Access Control Software replacement and hardware and wiring improvements. (Genetec DAC Software).
Mass Notification & Automated Lockdown System Controlled by Singlewire Informacast with Panic buttons, Blue Strobe Lights, Paging, Automated 911 connection and interfaces to Fire Alarm, Door Access Control and Telephone Systems.
Related Links: